Carton Flow Rack for Warehouse Racking System
Welfor carton flow rack By using alumal or steel roller rail system and under the influence of gravity, "first in and first out" for the goods is implemented. It is convenient to access and suitable for places such as the sides of the assembly line, distribution center, etc.
Features
1. Individual access to all pallets to full height of warehouse
2. Simple stock rotation achieved
3. Easy beam adjustment accommodates variable pallet heights
4. Compatible with many handling equipment styles
5. Conventional tolerance for floors when used to 10m high
6. Lower level pallets can be located on the floor (picking pallets)
7. Accessories available can accommodate every unit load type
Advantages:
1.space utilization is about 85%
2.suitable for substantial homogeneous goods .
3.pallet size should fit racks
Structure:
1. The racking is developed from the medium duty racking.
2. Aluminum or steel roller rail are equipped between a pair of beams per layer to form a slope of 3 degree, and under the fluency of gravity, first in first out of goods are realized.
3. It is convenient to access and suitable for such places as the two sides of the assembly lines, distribution centers, etc.
4. The height of the racking is normally lower than 2.5M and the loading capacity of each layer is 1000kg at the most.
Technicial data for Carton Flow Rack
Material: |
High quality rolled steel |
Surface treatment: |
Powder coating |
Color: |
Selective |
Capacity: |
1000kg Max per level |
packing |
Carton, bubble film, PE stretch smoothly or as client's suggestion |
Delivery time: |
10~30 days depending on order quantity |
Delivery port: |
Nanjing, Shanghai |
Production process
Packing and loading photos
Please provide information for quick quotation
1. the CAD drawing of the warehouse (if available)
2. size (Width, Depth, Height)
3. How many loads/levels
4. Quantity
5. Port of destination (for a CFR or CIF price basis)/ or FOB Nanjing
6. Loading capacity of each layer
FAQ
1, What is MOQ limitation for rack system?
++ NO. But large purchase will bring competitive prices, 20FT container ( 10T~13T) is highly recommended, so that production can be better handled.
2, What is the lead time
++ As per 20FT container loading, manufacture time is about 10-15 days; Regarding some customized items 20-25 days will be covered.
3, What is payments methods you can accept?
++ T/T and L/C are welcomed.
4, How about your sample delivery?
++ Short section of uprights and beams can be provided free of charge. But the freight will be collected upon your duty.
5, What is warranty for your rack system?
++ All rack items will be warrantied against manufacture's defects.
++ To avoid any shortage or missing components, we will provide 1%~2% spare parts besides basic ones.
Contact information